Septic And Well Setbacks
Lakeville Sets Distances Between Septic Parts, Wells, And Lot Lines
The Board of Health requires at least 50 feet from a septic tank to a well, 100 feet from a leach field to a well, and 10 feet from the property line to the tank and absorption system; the minimum lot for septic and well is 30,000 square feet. An addition can't land on top of those components, so find them on a plan before you sketch.
Source: Town of Lakeville


