The remodeler will measure the alcove, check the floor for level and soft spots, and look at the existing drain and valve. In a house from the 1970s, expect a recommendation to replace the valve, since new shower trim often needs a matching valve body.
Permits come next. The plumber files a plumbing permit with the Duxbury Building Department on paper, and the remodeler adds a building permit through the online portal if framing changes. After the tub comes out, the drain is adapted for a shower base, and the plumbing is inspected before the new walls go up.
Waterproofing, tile or panels, a door or fixed glass, and the trim finish the job. Ask for the schedule in writing, including the pauses for inspection, so you know when the bathroom will be out of service.