Tiling on its own is finish work. The state building code, 780 CMR 105.2, lists tiling alongside painting, carpeting and countertops as work that doesn't need a building permit. Brockton jobs rarely stay that simple: replacing plaster with new wallboard, repairing joists or moving plumbing brings in permits, and the Building Department at City Hall issues them online and inspects building, plumbing and wiring work.
On the first visit, expect the remodeler to tap the floor and walls for hollow spots, check the floor for bounce and ask how old the house is. In a pre-1978 home they should explain how they'll seal the doorway, protect the stairs and clean up at the end of each day.
After demolition, a careful installer stops to show you what turned up before closing anything in. Then come the backer board or membrane, a flood test of any new shower pan, the tile, the grout and flexible sealant at the corners and along the tub.