Expect the remodeler to walk the bathroom, the rooms around it, and the basement where the drain stack ends. In older Brockton homes they'll look for plaster over wood lath, past patchwork in the floor framing, and whether the stack is still cast iron or has already been replaced.
Brockton's Building Department, on the third floor of City Hall, issues permits online and performs the building, plumbing, and electrical inspections citywide. A suite remodel normally carries a building permit plus separate plumbing and wiring permits, and the inspectors will want to see rough work before any wall is closed.
When lead-safe work applies, picture plastic sheeting, sealed doorways, misting and HEPA cleanup, and a final cleaning check before the containment comes down. Those steps add days, so ask that they show up in the written timeline.