Demolition usually removes the tub, the surround, and enough wall to reach the valve. The plumber then sets a drain for a shower base or a tiled pan, replaces or updates the valve, and leaves the rough work open for inspection.
In Hull, the plumbing permit can be applied for online, but the inspection is booked by calling the part-time inspector directly. Any building permit for the remodeling side goes to the Building Department on paper, by mail, drop box, or in person, with the contractor's HIC and Construction Supervisor credentials attached.
Once the rough plumbing passes, the crew installs backer board and a waterproof layer, then tile or panels, glass, and trim. Ask the plumber to tell you what the supply lines are made of while the wall is open, and get that note in writing for your records.