Plumbing Permit Required
Any Change To Existing Plumbing Needs A Norwell Permit
The Building Department requires a plumbing or gas permit for any change to an existing system and for all new work. Relocating a shower valve, swapping in a linear drain, or adding a hand shower all count, so the plumber should file before the old tub comes out.


